Floor Preparation WIgan

Get in Touch

Free Quote From Our Vinyl Floor Fitters!

Brands We Work With:

Professional Subfloor Prep Service in Wigan & The North West

Proper floor preparation sits at the foundation of every successful luxury vinyl tile installation.

At Abernethy Bespoke Flooring, we know that even the highest quality LVT products can fail when installed on poorly prepared subfloors.

Our dedicated floor preparation service ensures your new flooring has the perfect base to perform at its best for years to come.

Initial Consulatation

We’ll discuss your vision, assess your space, and recommend the perfect flooring solution for your lifestyle and budget. Our expertise ensures your complete satisfaction.

Precise Preperation

Our skilled team meticulously prepares your subfloor using professional techniques and premium materials, creating the perfect foundation for a flawless installation.

Expert Installation

With precision craftsmanship, we transform your space with our seamless installation, leaving you with stunning, durable flooring that elevates your entire property.

Why Proper Subfloor Preparation Is Essential for LVT

Many flooring issues trace back to inadequate subfloor preparation. Bumps, dips, moisture problems, and structural weaknesses beneath your floor covering will inevitably show through or cause premature failure of your new LVT flooring.

A properly prepared subfloor provides the smooth, stable foundation needed for luxury vinyl tiles to sit correctly. This preparation prevents future issues like tiles lifting, seams opening, or uneven wear patterns developing across your floor.

Our expert floor prepping service pays dividends throughout the lifetime of your floor. While it might seem tempting to skip this step, the long-term benefits include extended flooring lifespan, better appearance, and avoiding costly repairs down the line.

Assessing Your Subfloor: Concrete, Asphalt, or Floorboards

Every successful floor preparation begins with a thorough site survey. During this initial visit, we carefully examine the condition and type of your existing subfloor – typically concrete, asphalt, or wooden floorboards.

This assessment allows us to spot potential problems early, such as moisture issues in concrete, unevenness in floorboards, or stability concerns. We check floor levels, test for dampness, and identify any repairs needed before preparation work begins.

Based on these findings, we develop a tailored preparation plan specifically for your space. Different subfloor types require different approaches, and our experience allows us to select the most appropriate method for your particular situation.

Floorboard Preparation Wigan: Ply Laying, Pinning & Sanding

Wooden floorboards require special attention to create the ideal base for LVT installation. Our standard approach involves overlaying floorboards with 6mm SPS101 flooring-grade plywood. This specific product provides exceptional stability and a clean surface for luxury vinyl tiles.

After secure fixing, each board joint receives careful feathering with floor levelling compound to eliminate any seams or transitions between boards. Once dry, we thoroughly sand the entire surface to achieve the perfectly smooth finish that LVT demands.

For particularly uneven floorboards, we might recommend 9mm plywood instead of the standard 6mm. In some cases, applying a self-levelling screed over the plywood offers the best solution for severely irregular floors. Our team assesses each job individually, recommending the most effective approach for your specific floor condition.

Preparing Asphalt Subfloors for LVT

Asphalt subfloors present unique challenges that require specific preparation techniques. The process begins with a thorough cleaning to remove all dust and debris from the surface.

Next, we apply a specialist gritty primer designed specifically for asphalt surfaces. This primer creates the essential bond between the asphalt and the self-levelling compound that follows. Without this crucial step, the screed would fail to adhere properly.

Once the primer has dried according to manufacturer specifications, we pour a carefully mixed self-levelling screed across the entire floor area. This compound flows into dips and irregularities, creating a perfectly flat surface ideal for LVT application. After curing, any minor imperfections are sanded away to ensure absolute smoothness.

Undercutting Door Frames for a Seamless Finish

A truly professional LVT installation addresses every detail – including door frames. After floor preparation is complete, we precisely undercut door frames to allow the luxury vinyl tiles to slip neatly underneath.

This technique eliminates unsightly gaps around doorways and creates that seamless, integrated look that distinguishes professional installations from DIY attempts. The LVT slides perfectly under the frame, creating clean transitions between rooms without requiring additional trims or profiles.

The undercutting process requires specialised tools and careful skill to avoid damaging your frames. Our experienced team takes the time to get this detail right, ensuring your finished floor looks perfect from every angle.

Why Choose Us for LVT Floor Preparation in Wigan?

We never cut corners or rush this vital stage. Our methodical approach ensures that every inch of your subfloor receives the attention needed for perfect LVT installation. We use only professional-grade materials – from our SPS101 plywood to our specialist primers and self-levelling compounds.

This attention to detail explains why our LVT Floor Fitters achieve such exceptional results. Whether you’re planning a simple living room renovation or extensive commercial project, proper floor preparation creates the foundation for long-lasting, beautiful floors.

Our preparation techniques work perfectly whether you’re planning standard Vinyl Flooring or intricate Herringbone Flooring patterns. The quality of your preparation directly influences the quality of your finished floor.

Need Help?

Subfloor Prep Wigan: FAQs

This depends on your subfloor type and condition. Simple preparation of a small area might take just one day, while larger spaces or those requiring DPM application typically need 2-3 days including drying time.

No, freshly applied screed needs time to cure properly. Most self-levelling compounds require at least 24 hours before light foot traffic, with full curing taking up to 72 hours depending on conditions.

Yes, professional floor preparation is essential for any LVT installation. Even apparently level floors often have imperfections that will affect your new flooring. Proper preparation prevents costly problems and extends the life of your new floor.

We have specific preparation techniques for floors with underfloor heating systems. These ensure proper heat distribution and prevent damage to your heating elements while creating the perfect surface for LVT installation.

Our preparation methods can address different floor heights between adjoining spaces. We can create gradual transitions, recommend appropriate threshold bars, or adjust preparation techniques to minimise height differences where possible.

Say Hello!

Contact ABF Today!

Ready to transform your space with premium vinyl flooring solutions? At Abernethy Bespoke Flooring, we’re here to turn your vision into reality. Whether you’re in Wigan or anywhere across the North West, our expert team is just a call or message away.

We proudly serve customers throughout the North West region, including Manchester, Liverpool, Bolton, Preston, Warrington, and surrounding areas. 

Don’t settle for anything less than exceptional vinyl flooring that stands the test of time. Reach out now and take the first step toward beautiful, durable floors that enhance your home or business.